£350 million data centre planned for Stockport ex-industrial unit
The 40MW data centre at Kenwood Point in Reddish is expected to be operational late 2025, and be powered by 100% renewable energy and recycle waste heat into the local community.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed